Last updated November 26, 2025
Can polymeric sand be applied in cold weather?
Yes, polymeric sand can be installed in cold weather but since it needs to be activated with water, you'll need to avoid freezing temperatures. Products like Alliance Gator G2 Polymeric Sand can be installed above 32°F (0°C) with dry conditions. A minimum of 15 minutes of dry weather is also required after activation in traditional application and 24 hours in overlay applications. Don’t apply if the temperatures are predicted to drop below freezing for 48–72 hours after installation. It’s also important to note that the sand won’t cure until it fully dries out — in colder temperatures, the drying time could take several days.
⚡️KEY TAKEAWAYS
Never apply polymeric sand in freezing temperatures
G2 polymeric sands by Alliance can be installed above 32°F (0°C) with dry conditions
Don’t apply if the temperatures are predicted to drop below freezing for 48–72 hours after installation
Colder temperatures means a longer drying time for the sand
Always review the manufacturer’s guidelines for temperature/weather prior to starting your installation
Related questions
Can I store unopened bags of polymeric sand outside?
Yes, but they must be protected from getting wet. If water or moisture penetrate the bag, the material inside may be jeopardized.